Mining operations continued steadily on the South Dune orebody with mined tonnage of 4.3Mt, lower than the last quarter’s 4.6Mt. Productivity was impacted by lower face heights and reduced water pressures as some hydro mining guns approached the end of the current mining blocks and the distance from the pumping stations increased. As hydraulic mining units are [ More..] KSH: 0/KG Qty: